    Contractor:

    BAM
  • icon_not_found

    Revenue:

Do you want to receive more information about this project or do you want a document for sharing? Click the button below to download a printer friendly PDF file.

Download Project Flyer

Overpass of 500 meters

For this overpass, Holcon provided the engineering, production and assembly of the prefab concrete. In addition, also the supply of bearing blocks, prestressing and the reinforcement of the pressure layers. The overpass is approximately 25 meters x 500 meters. For this purpose, among other things, 375 rail girders, 30 bottom girders of 80 tons each and 150 edge elements were produced. The engineering was carried out by "Lincon", the assembly by "Mammoet betonmontage".